five

Energy Efficient Scheduling in a Robotic Cell with a Material Handling Robot Serving Two Parallel Machines

收藏
NIAID Data Ecosystem2026-05-01 收录
下载链接:
https://data.mendeley.com/datasets/9dnrvdmzfn
下载链接
链接失效反馈
官方服务:
资源简介:
There are 360 instances for the problem. Each file contains data for an instance. The name of the files represents the parameter setting used. Nx indicates there are x parts in the instance. D1 indicates the short-distance scenario in the instance. D2 indicates the long-distance scenario in the instance. D3 indicates the mixed-distance scenario in the instance. T1 indicates the case where the machines are identical and processing times are generated between 5 and 45 in the instance. T2 indicates the case where the machines are identical and processing times are generated between 5 and 90 in the instance. T3 indicates the case where machine 1 is faster than machine 2. The processing times are generated between 5 and 45. T4 indicates the case where machine 2 is faster than machine 1. The processing times are generated between 5 and 45. C1 indicates full robot move and empty robot move coefficients are equal in the instance. C2 indicates full robot move coefficient is higher than empty robot move coefficient in the instance. We have 5 replications for each parameter setting. r1, 1r2, r3, r4, and r5 indicates the replication number.
创建时间:
2023-11-06
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作