five

Simulink Model of a New Energy EVG-005 5kW Hydropower Turbine

收藏
DataCite Commons2023-10-11 更新2025-04-09 收录
下载链接:
https://www.osti.gov/servlets/purl/2008045/
下载链接
链接失效反馈
官方服务:
资源简介:
Simulink model for a New Energy 5kW hydropower turbine. ADCP data ("ds_streamwise_7_13.nc") and DC voltage, DC current, and rotor rotation observed from the New Energy EVG-005 Current Energy Converter (CEC) ("electrical_7_13_10ohms.nc") were collected at the Tanana River Test Site (TRTS) near Nenana Alaska. - Data was collected on July 13th, 2023 with a constant 10 ohms resistance applied with a DC load bank. - Simulink model is meant to resemble the electrical setup at the TRTS. - Model is initialized by running the "NewEnergy_2023_10hz.m" Matlab script. Then the Simulink model ("New_Energy_Model_PMSM.slx") can be run. - Results are processed with the "NewEnergy_2023_processing.m" Matlab code. The Matlab results are also saved in the "New_Energy_7_13_model_validation_results.mat" Matlab file. This can be directly loaded into the Matlab Workspace using the "Load()" command. - The timetable variables "electrical_model_downsampled" is the model results and the "electrical_limited" is the experimental data from the TRTS.
提供机构:
Marine and Hydrokinetic Data Repository (MHKDR); University of Alaska Fairbanks
创建时间:
2023-10-11
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作