five

Original timetable.

收藏
NIAID Data Ecosystem2026-05-01 收录
下载链接:
https://figshare.com/articles/dataset/Original_timetable_/22676694
下载链接
链接失效反馈
官方服务:
资源简介:
In recent years, with increasing passenger travel demand, high-speed railways have developed rapidly. The stop planning and timetabling problems are the core contents of high-speed railway transport planning and have important practical significance for improving efficiency of passenger travel and railway operation Dong et al. (2020). This study proposes a collaborative optimization approach that can be divided into two phases. In the first phase, a mixed-integer nonlinear programming model is constructed to obtain a stop plan by minimizing the total passenger travel time. The constraints of passenger origin-destination (OD) demand, train capacity, and stop frequency are considered in the first phase. In the second phase, the train timetable is optimized after the stop plan is obtained. A multiobjective mixed-integer linear optimization model is formulated by minimizing the total train travel time and the deviation between the expected and actual departure times from the origin station for all trains. Multiple types of trains and more refined headways are considered in the timetabling model. Finally, the approach is applied to China’s high-speed railway, and the GUROBI optimizer is used to solve the models in the above two stages. By analyzing the results, the total passenger travel time and train travel time decreased by 2.81% and 3.34% respectively. The proposed method generates a more efficient solution for the railway system.
创建时间:
2023-04-21
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作