Input and output data of the modelling work for the paper Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System
Considered scenario years: 2030, 2040 and 2050
The profiles are based on the historical year 2016.
Two scenarios are included: lower connectivity and high connectivity
The data cover the ENTSO-E member countries except Iceland and Cyprus and is given in country-specific resolution.
Input:
Demand as hourly profile in MWh
Variable RES-E as hourly profile in MWh
Power plant fleet as capacities in MW
NTCs as capacities in MW
Output:
CO2 emissions as annual data in Mt
Variable electricity generation costs as annual data in MEur
Variable electricity generation costs per generation as annual data in Euro/MWh
Electricity generation as annual data in TWh
Electricity export as annual data in TWh
Electricity import as annual data in TWh
Transit flows as annual data in TWh
The sources are described in the corresponding paper under the following link: https://www.mdpi.com/1996-1073/12/16/3098