five

Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System - Dataset

收藏
NIAID Data Ecosystem2026-03-12 收录
下载链接:
https://zenodo.org/record/3257494
下载链接
链接失效反馈
官方服务:
资源简介:
Input and output data of the modelling work for the paper Effects of a Delayed Expansion of Interconnector Capacities in a High RES-E European Electricity System Considered scenario years: 2030, 2040 and 2050 The profiles are based on the historical year 2016. Two scenarios are included: lower connectivity and high connectivity The data cover the ENTSO-E member countries except Iceland and Cyprus and is given in country-specific resolution. Input: Demand as hourly profile in MWh Variable RES-E as hourly profile in MWh Power plant fleet as capacities in MW NTCs as capacities in MW Output: CO2 emissions as annual data in Mt Variable electricity generation costs as annual data in MEur Variable electricity generation costs per generation as annual data in Euro/MWh Electricity generation as annual data in TWh Electricity export as annual data in TWh Electricity import as annual data in TWh Transit flows as annual data in TWh The sources are described in the corresponding paper under the following link: https://www.mdpi.com/1996-1073/12/16/3098
创建时间:
2021-04-29
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作