遇见数据集

Renewable electricity development projects (as at 31 December 2022)

收藏
data.europa2024-06-27 收录
官方服务:

资源简介:

This dataset exposes the connection projects (in MW) under development on the transmission and distribution networks in electricity as at 31 December 2022. For the TEN network, these are projects which have been the subject of an “entry queue proposal” or an accepted “technical and financial proposal” or which have been selected in the context of a call for tenders. For the Enedis network and the ELDs, these are projects for which a connection request has been qualified as complete by the distribution system operator. This dataset exposes the connection projects (in MW) under development on the transmission and distribution networks in electricity as at 31 December 2022. For the TEN network, these are projects which have been the subject of an “entry queue proposal” or an accepted “technical and financial proposal” or which have been selected in the context of a call for tenders. For the Enedis network and the ELDs, these are projects for which a connection request has been qualified as complete by the distribution system operator.

二维码
社区交流群
二维码
科研交流群
商业服务