Learned value modulates the access to visual awareness during continuous flash suppression
收藏数据链接:
官方服务:
资源简介:
Data from Experiment 1 and Experiment 2 are reported in separate files. Each line contains the mean suppression time of a target grating under continuous flash suppression expressed in seconds for one participant. Each column refers to a different condition:<br> HREV = visual stimuli associated with high monetary reward<br> LREV = visual stimuli associated with low monetary reward<br> base = baseline measurements before associative learning<br> P1 = first measurement after associative learning<br> P2 = second measurement after associative learning<br> P3 = third measurement after associative learning For experiment 1, a short (20 trials) associative learning recall session was performed between P1 and P2 and between P2 and P3.
提供机构:
Zenodo创建时间:
2022-10-04



