Dataset for E-Laas WP0 - Repository of cases characterizing logistic system scenarios (Milestone M0)
收藏资源简介:
The purpose of this dataset is to provide structured input data for simulation studies of selected urban logistics scenarios developed in the E-Laas project. The presented dataset is an outcome of the work conducted within WP0 of the E-Laas project and represents Milestone M0. It should be understood as a common reference dataset supporting the definition, structuring and analysis of reference cases and scenarios. Other datasets published as part of project reports or individual scientific publications may contain additional data, extended variables or more detailed input structures resulting from the specific methodological requirements and research objectives of those studies. The dataset was created as part of the E-Laas project (Energy optimal urban logistics As A Service).Project implemented as part of the call ERA-NET Cofund Urban Accessibility and Connectivity (ENUAC China Call) organized by JPI Urban Europe and the National Natural Science Foundation of China (NSFC). This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 875022. E-Laas project is carried out in an international consortium. Project coordinator in Europe: Chalmers University of Technology (Sweden), project coordinator in China: Shanghai University (China), consortium members: Tsinghua University (China), Warsaw University of Technology (Poland), cooperation partners: Stockholms stad, Trafikkontoret (Sweden), ParkUnload (Spain), Metropolis GZM (Poland), Shanghai Urban-Rural Construction and Transportation Department (China), Volvo Group Trucks Technology and Operations (Sweden).- The Chinese part of the project is funded by National Natural Science Foundation of China.- The Swedish part of the project is funded by Swedish Energy Agency.- The Polish part of the project is funded by the National Science Centre, Poland (project no. 2022/04/Y/ST8/00134). The value of the co-financing is PLN 878,107.00. Project duration 27/04/2023 - 26/04/2026 (36 months).



