Climate Chamber Bamboo
收藏官方服务:
资源简介:
Evaporation data for each month of the year organized as: EB”_”Month””V” The 1st column is the elapsed time and the 2nd is the mass loss The air velocities (V) are: 1 and 2 -> 0.22 m/s 3 and 4 -> 1 m/s 5 -> 0.42 m/s 6 -> 0.64 m/s The validation tests are named: “Validation_i” for each model validation point under the following conditions: 1 -> T=17ºC HR = 70% V = 0.27 m/s 2 -> T=23ºC HR = 55% V = 0.35 m/s 3 -> T=26ºC HR = 53% V = 0.52 m/s 4 -> T=27ºC HR = 59% V = 0.61 m/s 5 -> T=31ºC HR = 48% V = 0.78 m/s
提供机构:
Zenodo创建时间:
2024-10-11



