Design of solution V1.0
收藏资源简介:
This report (deliverable) named D6.1 Design of solution is deliverable of WP6 within InterFlex<br> H2020 (project co-founded by the European Commission). CEZ Distribuce as WP6 leader aims<br> to perform demonstrations of innovative smart grid solutions in order to increase DER hosting<br> capacity, integrate EV charging stations and home energy storage systems more effectively<br> and thus cover important challenges of European DSOs.<br> The use cases demonstration is performed under the coordination and management of CEZ<br> Distribuce. Partners involved in the WP6 are Austrian Institute of Technology (AIT), CEZ<br> Solarni, Fronius, Schneider Electric and Siemens.<br> As it is stated in GA in Description of Work (DoW), D6_1 Design of solutions contains detail<br> design of technical solutions of all WP6 use cases, results of customer’s recruitment, lab<br> tests results and KPIs definition.<br> This report describes in detail the design of solutions for WP6 that will be implemented in<br> next stage of the project and then reported in D6.2 Implementation of solution (deliverable<br> due date 12/2018).<br> After the evaluation phase of the project, WP6 results will be reported in D6.3Demonstration<br> activities results (due date 12/2019). This final deliverable of WP6 will also contain CBA and<br> SRA of demonstrated



