遇见数据集

Former Blue Star Remediation

收藏
Dallas GIS Hub2026-04-21 更新2026-07-13 收录
官方服务:

资源简介:

The dashboard is showing ground cleanup load and volume tracking at the Former Blue Star Site. The dashboard shows Sanitation load and volume tracking by workdays. The data was collected using Survey 123 form filled by clients. The layer that feeds the dashboard is: Blue Star Remediation Survey Results. This dashboard is embedded in the: Former Blue Star Remediation Storymap, which is the main application created for this project. Project Background: After the site was cleared of all shingles between December 2020 and May 2021, the City conducted environmental site assessments to determine if the property was affected by any historical uses at or near the property. The City identified undocumented filling of the property in the 1970s and 1980s as part of prior commercial operations. Subsequent subsurface investigation identified lead concentrations in soil exceeding regulatory standards and fill material inclusive of brick, concrete, and metal that extended up to eight feet below grade. The City acquired the property in July 2021 and conducted additional soil testing to delineate limited areas of lead-impacted soil and to ensure that stormwater controls are effectively limiting erosion. To address the elevated lead concentrations in soil, the property was entered into the Texas Voluntary Cleanup Program (VCP) in August 2022 to pursue closure with the State. The remediation plan, that was developed and approved by VCP, addresses all historic environmental concerns to allow all possible reuse options (unrestricted reuse).

创建时间:
2023-08-15
二维码
社区交流群
二维码
科研交流群
商业服务