VZV_SIP Corridors
收藏data.cityofnewyork.us2024-12-09 更新2025-01-08 收录
下载链接:
https://data.cityofnewyork.us/Transportation/VZV_SIP-Corridors/if4c-w48d
下载链接
链接失效反馈官方服务:
资源简介:
Safety-oriented engineering improvements that use multiple treatments (signals, markings, concrete etc) on both corridors and intersections. Improvements are generally aimed at better organizing traffic, improving travel times, creating shorter, safer pedestrian crossings, and safe routes for bicycle travel. The map displays operational (non-capital) projects from 2009 to YTD. For more information on the individual projects, please visit the DOT website: https://www1.nyc.gov/html/dot/html/about/current-projects.shtml
For a complete list of Vision Zero maps, please follow <a href="https://data.cityofnewyork.us/browse?q=vzv&sortBy=last_modified&utf8=%E2%9C%93">this link</a>
以安全为导向的工程改进,采用多种处理方法(如信号、标记、混凝土等)对走廊和交叉口进行改造。这些改进旨在优化交通组织、提升旅行时间、缩短且更安全的行人横穿区域,以及为自行车出行提供安全路线。地图展示了2009年至当年至今运营中的(非首都)项目。如需了解更多关于单个项目的详细信息,请访问DOT网站:https://www1.nyc.gov/html/dot/html/about/current-projects.shtml。欲获取Vision Zero地图的完整列表,请点击<a href="https://data.cityofnewyork.us/browse?q=vzv&sortBy=last_modified&utf8=%E2%9C%93">此链接</a>。
提供机构:
NYC Open Data



