five

MEX-M-MRS-1-2-3-EXT2-2901

收藏
esdcdoi.esac.esa.int2025-03-22 收录
下载链接:
http://esdcdoi.esac.esa.int/doi/html/data/planetary/MARS-EXPRESS/MEX-M-MRS-1-2-3-EXT2-2901.html
下载链接
链接失效反馈
官方服务:
资源简介:
Data Set Overview The Mars Express (MEX) Radio Science (MaRS) Data Archive is a timeordered collection of raw and partially processed data collected during the MEX Mission to Mars. For more information on the investigations proposed see the MaRS User Manual MARSUSERMANUAL2004 in the MaRS DOCUMENT/MRS_DOC folder. This is a Global Gravity measurement covering the time 20110516T23:28:39.500 to 20110517T03:47:30.500. This data set was collected during the MEX Extended Mission Phase 2 (EXT2) 2007 to tbd. This is a measurement of the Global Gravity field of Mars. Global gravity measurements were typically done when Mars Express was around Apocenter. There were four types of scientific measurements conducted during Extended Mission: Solar Conjunction, Occultation, Bistatic Radar and Gravity where one has to distinguish between gravity measurements conducted on Phobos as well as global gravity measurements on Mars which were conducted around apocenter and target gravity measurements on Mars which were conducted around pericenter over interesting geophysical structures. For more information see INST.CAT or the MaRS User Manual MARSUSERMANUAL2004. For all measurements if not indicated otherwise Transponder 1 onboard the s/c was used. Transponder 2 is designed to be a backup. Mission Phase Definition It should be noted that the Mars Express (MEX) Radio Science (MaRS) group uses mission phases which deviate from the ones defined in the MISSION.CAT files given by ESA in order to keep the keywords and abbreviations consistent for Mars Express, and Rosetta. For Venus Express other definitions are used. Those mission phase abbreviations are also used in the data description field of the dataset_id. MaRS mission name | abbreviation | time span Near Earth Verification | NEV | 20030602 20030731 truncated!, Please see actual data for full text [truncated!, Please see actual data for full text]

数据集概览:火星快车号(Mars Express,简称MEX)无线电科学(MaRS)数据档案库是一系列按时间顺序排列的原始及部分处理数据,这些数据在火星快车号任务期间收集。关于所提议的调查,请参阅MaRS用户手册MARSUSERMANUAL2004,该手册位于MaRS文档/MRS_DOC文件夹中。本数据集覆盖了自20110516T23:28:39.500至20110517T03:47:30.500的时间段,是一项全球重力测量。该数据集在MEX扩展任务第二阶段(EXT2)2007年至待定期间收集。该数据集是对火星全球重力场的测量。通常在火星快车号接近远日点时进行全球重力测量。在扩展任务期间,共进行了四种类型的科学测量:太阳联合观测、掩星、双站雷达和重力测量。在此过程中,需要区分在火卫一上进行的重力测量以及火星上的全球重力测量(在远日点附近进行)和火星上特定地理结构周围的靶重力测量。更多信息请参阅INST.CAT或MaRS用户手册MARSUSERMANUAL2004。除非另有说明,所有测量均使用搭载在卫星上的应答器1进行。应答器2设计为备份。任务阶段定义:值得注意的是,火星快车号(MEX)无线电科学(MaRS)小组使用的任务阶段与ESA提供的MISSION.CAT文件中定义的任务阶段存在差异,以保持火星快车号、罗塞塔号的关键词和缩写的一致性。对于金星快车号,则使用其他定义。这些任务阶段的缩写也用于数据集_id的数据描述字段中。MaRS任务名称 | 缩写 | 时间范围 火星快车号 | MEX | 20030602 - 20030731(截断!请参阅实际数据以获取完整文本)
提供机构:
European Space Agency
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作