Great Britain BESS Fleet Data-Integrity Screening and Pillswood Grid-Dispatch Capacity Audit
收藏官方服务:
资源简介:
Level 1 data integrity and Level 2 physics compliance screening for the Great Britain BESS fleet, and a deep-dive 12-month grid-dispatch capacity audit for Pillswood BESS (E_PILLB-1 & E_PILLB-2) under the VolMax P10 Verification Protocol. The audit uses 30-minute metered volumes from Elexon B1610 telemetry to evaluate active power capacity (98 MW claim) and energy capacity (196 MWh claim) split across a pre-registered unseen window (July 2025 - May 2026) and a scoped window (June 2026).
提供机构:
Zenodo创建时间:
2026-07-08



