Description of the data collection procedures.
收藏NIAID Data Ecosystem2026-05-01 收录
下载链接:
https://figshare.com/articles/dataset/Description_of_the_data_collection_procedures_/23809889
下载链接
链接失效反馈官方服务:
资源简介:
Background
A large-scale national cohort aiming at investigating the health status and determinants in the general population is essential for high-quality public health research and regulatory decision-making. We present the protocol and first results of the pilot phase to a Swiss national cohort aiming at establishing the study procedures, evaluating feasibility, and assessing participation and willingness to participate.
Methods
The pilot phase 2020/21 included 3 components recruited via different channels: a population-based cross-sectional study targeting the adult population (20–69 years) of the Vaud and Bern cantons via personal invitation, a sub-study on selenium in a convenience sample of vegans and vegetarians via non-personal invitation in vegan/vegetarian networks, and a self-selected sample via news promotion (restricted protocol). Along with a participatory approach and participation, we tested the study procedures including online questionnaires, onsite health examination, food intake, physical activity assessments and biosample collection following high-quality standards.
Results
The population-based study and the selenium sub-study had 638 (participation rate: 14%) and 109 participants, respectively, both with an over-representation of women. Of altogether 1349 recruited participants over 90% expressed interest in participating to a national health study, over 75% to contribute to medicine progress and help improving others’ health, whereas about one third expressed concerns over data protection and data misuse.
Conclusions
Publicly accessible high-quality public health data and human biomonitoring samples were collected. There is high interest of the general population in taking part in a national cohort on health. Challenges reside in achieving a higher participation rate and external validity. For project management clear governance is key.
创建时间:
2023-07-31



