Results for the Management Forecast Bias Hypothesis (Hypothesis 1).
收藏NIAID Data Ecosystem2026-03-08 收录
下载链接:
https://figshare.com/articles/dataset/_Results_for_the_Management_Forecast_Bias_Hypothesis_Hypothesis_1_/827213
下载链接
链接失效反馈官方服务:
资源简介:
Logistic regression results of the first and second subsamples. The coefficients and related t-statistics are estimated by using the following model: Prob(Down = 1) = F(α0+α1 AR+α2AR×Difficulty+α3AR×FREQ+α4 LMV+α5 MB+α6 Hightech+α7 Lag_Loss+ε).
*, **,***Significant at 0.1, 0.05 and 0.01 levels, respectively based on one-tailed tests for signed predictions, two-tailed tests otherwise.
创建时间:
2013-10-17



