Updated Baseline Cost Model for Hydropower (2023)

收藏
DataCite Commons2024-10-01 更新2025-04-09 收录
下载链接:
https://www.osti.gov/servlets/purl/1968485/
下载链接
链接失效反馈
官方服务:
资源简介:
The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.
提供机构:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
创建时间:
2023-04-07
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作