中国 水力发电:财务费用:利息支出:累计
收藏www.ceicdata.com2015-10-01 更新2025-03-25 收录
下载链接:
https://www.ceicdata.com/zh-hans/china/financial-data-electricity-production-hydro-power/cn-hydro-power-financial-expense-interest-expense-ytd
下载链接
链接失效反馈官方服务:
资源简介:
水力发电:财务费用:利息支出:累计在10-01-2015达47.306十亿人民币,相较于09-01-2015的42.774十亿人民币有所增长。水力发电:财务费用:利息支出:累计数据按月更新,12-01-1998至10-01-2015期间平均值为13.142十亿人民币,共102份观测结果。该数据的历史最高值出现于12-01-2014,达55.372十亿人民币,而历史最低值则出现于02-01-2006,为1.784十亿人民币。CEIC提供的水力发电:财务费用:利息支出:累计数据处于定期更新的状态,数据来源于国家统计局,数据归类于中国经济数据库的公用事业 – Table CN.RCB: Financial Data: Electricity Production: Hydro Power。
Hydropower: Financial Costs: Interest Expenditure: The cumulative amount reached 47.306 billion RMB on 10-01-2015, showing an increase compared to 42.774 billion RMB on 09-01-2015. The cumulative data for hydropower financial costs and interest expenditure is updated monthly, with an average of 13.142 billion RMB from 12-01-1998 to 10-01-2015, resulting in a total of 102 observations. The historical maximum value was recorded on 12-01-2014, reaching 55.372 billion RMB, while the historical minimum value occurred on 02-01-2006, at 1.784 billion RMB. The CEIC's hydropower financial costs and interest expenditure cumulative data is available for regular updates, sourced from the National Bureau of Statistics and categorized under the Public Utilities section of the China Economic Database – Table CN.RCB: Financial Data: Electricity Production: Hydro Power.
提供机构:
www.ceicdata.com



