five

Assessing the causes of project overruns in tunnel construction projects in Pakistan

收藏
Figshare2021-12-30 更新2026-04-28 收录
下载链接:
https://figshare.com/articles/dataset/Assessing_the_causes_of_project_overruns_in_tunnel_construction_projects_in_Pakistan/17704837
下载链接
链接失效反馈
官方服务:
资源简介:
Tunnel construction is considered a bottleneck point in mega construction projects because of higher associated risks and uncertainties. This study is an attempt to identify and rank the causes project overruns in tunnel construction projects in Pakistan and propose a mitigation strategy to minimize their effects. For the given purpose, a total of 32 key causes were obtained from the literature and discussion with a team of experts and practitioners. A web-based questionnaire survey was used for data collection. About 55 complete responses were received from the practitioners working as clients, consultants, and contractors in Pakistan. The identified causes were ranked using frequency, severity, and relative importance indexes. The most important causes were found to be inexperienced and incompetent contractors, ignoring consultants' instructions by contractors, inadequate project estimates, delay in issuance of funds to the contractors, and low bids. This study can be employed for controlling the leading causes of overruns in tunnel construction projects. Moreover, it can serve as a guide in further investigation of the causes of project overruns in tunneling in different countries.
创建时间:
2021-12-30
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作