遇见数据集

Utah FORGE: Well 16B(78)-32 Drilling Data

收藏
Mendeley Data2024-03-31 更新2024-06-28 收录
官方服务:

资源简介:

This drilling data for Utah FORGE well 16B(78)-32 include a well survey, core summary, mud and mud temperature logs, daily reports of the drilling process, and additional data from the Pason oil and gas company. Well 16B(78)-32 serves as the production well for reservoir creation, fluid circulation, and demonstration of heat extraction for the FORGE project. It has been drilled as a doublet approximately 300 feet parallel to and above the injection well 16A(78)-32. The proposed total depth was 10,658 feet, which was exceeded. Spudding began on April 26th, 2023. As of June 20th, 2023, the total depth measured 10,947 feet and the vertical depth measured 8,357 feet. Drilling included the trial use of insulated drill pipe (IDP) from Eavor Technologies, which was considered a success. IDP restricts counter-current heat transfer between drilling fluid inside the drill string and hotter returning fluid in the annulus, thereby ensuring the bottomhole assembly (BHA) remains submerged in cool fluid. Eavor rented 350 joints of IDP to FORGE which were run in two consecutive BHAs at the well. The results of this trial are included here.

本数据集涵盖犹他州FORGE项目16B(78)-32号井的钻井数据,包含井眼测量数据、岩心综合报告、泥浆及泥浆温度测井资料、钻井过程日报,以及Pason油气公司提供的额外数据。16B(78)-32号井为FORGE项目的生产井,用于储层改造、流体循环及热提取性能演示。该井属于双井组部署井,与注入井16A(78)-32平行布设,且位于其上方约300英尺处。设计总钻井深度为10658英尺,实际钻井深度超出该设计值。钻井作业于2023年4月26日开钻,截至2023年6月20日,实测总深度为10947英尺,垂深为8357英尺。本次钻井作业试用了Eavor Technologies公司生产的绝缘钻杆(insulated drill pipe, IDP),试用效果被认定为成功。绝缘钻杆可限制钻柱内钻井液与环空内高温返排流体之间的逆流换热,从而确保井底钻具组合(bottomhole assembly, BHA)始终处于低温钻井液的浸泡环境中。Eavor Technologies向FORGE项目租赁了350根绝缘钻杆,该批钻杆随两套连续下入的井底钻具组合一同下入该井。本次试用的相关结果已收录于本数据集。

创建时间:
2023-09-12
搜集汇总
背景与挑战
背景概述
该数据集提供了犹他州FORGE项目井16B(78)-32的钻井数据,包括井调查、岩心总结、泥浆日志和日报告等,用于支持储层创建和热提取示范。关键特点是钻井深度超出预期,总深度达10,947英尺,并成功试验了绝缘钻管技术以优化钻井过程中的热管理。
以上内容由遇见数据集搜集并总结生成
二维码
社区交流群
二维码
科研交流群
商业服务