Pareto fronts of the Flexible Job Shop Scheduling Problem from Fattahi's benchmark
收藏Mendeley Data2024-03-27 更新2024-06-26 收录
下载链接:
https://data.mendeley.com/datasets/cb34wwptj7
下载链接
链接失效反馈官方服务:
资源简介:
Pareto fronts (PF) found by a parallel Branch and bound. The data was obtained by a parallel branch-and-bound with shared memory architecture. A total of 24 threads were used with a time limit of 120 hours. The Pareto fronts are from Fattahi's benchmark. The objectives are the makespan, max workload, and total workload. The optimal Pareto fronts found are from SFJS1 to SFJS10 and MSFJ1 to MFJS2. From MFJS3 to MFJS10 are the Pareto fronts found by a Branch-and-Bound algorithm. The data contains a Readme file with a long description.
创建时间:
2024-01-23