five

Construction method

收藏
国家林业和草原科学数据中心2023-02-12 更新2024-03-07 收录
下载链接:
https://www.forestdata.cn/dataDetail.html?id=40e4dfc1-3907-40f5-9ef9-1af3b9f93b0b
下载链接
链接失效反馈
官方服务:
资源简介:
A construction method includes a charcoal paint application step in which a charcoal paint is applied to at least one of a floor, a wall, and a ceiling within a construction target room; an arrangement step in which flooring members made of Obi-sugi are arranged on the floor of the room; a diatomaceous earth application step in which diatomaceous earth is applied to the wall of the room; and a spraying step in which an antioxidant aqueous solution is sprayed on at least one of the floor on which the flooring members are arranged, the wall to which the diatomaceous earth is applied and the ceiling to which the charcoal paint is applied.
提供机构:
国家林业和草原科学数据中心
创建时间:
2023-02-12
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作