New fire brigade Reichersberg
收藏data.europa2024-06-27 收录
官方服务:
资源简介:
The building consists of a head building in which command, readiness, training room, changing rooms, toilets and adjoining rooms are housed. the vehicle hall with 5 pitches includes hose tower, KAT warehouse, building technology and ancillary rooms. Head building as a solid building with STB ceilings and flat roof. Facade plastered or with metal facade cladding. Vehicle hall and hose tower made of hollow STB walls partly insulated in the core and pillars with plaster/metal facade. Roof structure with BSH beams, trapezoidal sheet support elements, MW insulation and flat roof foil TPO.



