遇见数据集

Redispatch

收藏
data.europa2022-03-17 更新2025-06-01 收录
官方服务:

资源简介:

Renewable energy generation plants need to be reduced in their feed-in due to grid constraints in order to ensure grid stability. This process is called **redispatch**. The data shall include information on the number of hours and the number of EEG installations that had to be reduced in order to ensure grid stability. *Both the data of current and forecast EEG measures have been compiled with the greatest possible care and prepared for presentation. Nevertheless, in particular recording and transmission errors as well as incomplete delivery by third parties cannot be excluded. Schleswig-Holstein Netz AG therefore expressly reserves the right to change the published data and presentations and assumes no liability for the topicality, completeness and correctness.* Visualisation of the data: https://www.netzampel.energy/shnetz

为保障电网稳定运行,可再生能源发电场站需因电网约束下调上网电量,该流程被称为**重新调度(redispatch)**。 本数据集需包含为保障电网稳定而实施下调的总时长,以及需执行下调的EEG(德国可再生能源法案)装机数量相关信息。 当前及预测的EEG相关调控数据均已尽可能审慎地编制并完成展示准备。然而,无法完全排除记录与传输错误,以及第三方交付信息不完整的情况。因此,石勒苏益格-荷尔斯泰因电网公司(Schleswig-Holstein Netz AG)明确保留修改已发布数据及展示内容的权利,且不对数据的时效性、完整性与准确性承担任何责任。 数据可视化链接:https://www.netzampel.energy/shnetz

创建时间:
2022-03-17
二维码
社区交流群
二维码
科研交流群
商业服务