海底隧道工期预测数据

收藏
山东省数据知识产权存证登记平台2025-02-27 更新2025-03-14 收录
下载链接:
https://sddip.com/djgg/publicDetails/dcdaa96e54a24444a8c4040007ba137d
下载链接
链接失效反馈
官方服务:
资源简介:
海底隧道工期预测数据是基于胶州湾第二海底隧道项目施工过程中积累的多维度数据资源,通过整合施工进度、地质条件、施工工法等关键数据,为科学的工期预测和施工管理提供基础支撑。具体如下: 1、各工程段施工进度数据:该数据记录了各工程段的施工时间及计划安排,能够帮助项目管理者掌握工程的进度,优化资源分配,并及时发现和解决进度上的偏差。 2、各工程段施工工法数据:该数据是记录海底隧道施工中具体施工方法的核心数据,主要用于反映不同施工段的施工技术选择。数据通过WBS编码进行唯一标识,每条数据对应一个具体的施工任务或工程段。 3、地质详细勘察数据:该数据全面反映了隧道沿线的地质结构和施工环境的复杂性,涵盖断裂带信息、围岩参数与等级、渗水数据等重要地质勘察成果,为工程规划、施工工艺选择和施工安全管理提供了科学依据。 4、超前地质预测数据是通过探地雷达、地质钻探等先进技术获取的地质超前预报信息,用于预测隧道施工前方地质条件的变化。这些数据能够反映施工区域前方的地质结构特点,为施工过程中的风险评估和工法选择提供关键支持。 将以上4类数据进行整合,支撑了海底隧道这一复杂工程的工期预测。

The construction period prediction data for subsea tunnels is a multi-dimensional data resource accumulated during the construction of the Jiaozhou Bay Second Subsea Tunnel project. By integrating key data such as construction progress, geological conditions, and construction methods, it provides basic support for scientific construction period prediction and construction management. The details are as follows: 1. Construction progress data of each engineering section: This data records the construction time and planned arrangements of each engineering section, enabling project managers to grasp the project progress, optimize resource allocation, and timely detect and resolve schedule deviations. 2. Construction method data of each engineering section: This is the core data that records the specific construction methods used in subsea tunnel construction, mainly used to reflect the construction technology choices of different construction sections. Each record is uniquely identified by a WBS (Work Breakdown Structure) code, and each entry corresponds to a specific construction task or engineering section. 3. Detailed geological survey data: This data comprehensively reflects the geological structure along the tunnel and the complexity of the construction environment, covering important geological survey results such as fault zone information, surrounding rock parameters and grades, and water seepage data. It provides a scientific basis for engineering planning, construction technology selection and construction safety management. 4. Advanced geological prediction data: This refers to geological advance prediction information obtained through advanced technologies such as Ground Penetrating Radar (GPR) and geological drilling, which is used to predict changes in geological conditions ahead of tunnel construction. This data can reflect the geological structure characteristics of the area ahead of the construction site, providing key support for risk assessment and construction method selection during the construction process. The integration of the above four types of data provides support for construction period prediction of this complex subsea tunnel project.
提供机构:
青岛国信胶州湾第二海底隧道有限公司
搜集汇总
数据集介绍
main_image_url
以上内容由遇见数据集搜集并总结生成
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作