遇见数据集

WCC Wastewater Interceptor

收藏
ArcGIS Hub2025-11-05 更新2026-07-05 收录
官方服务:

资源简介:

Wastewater Interceptor owned by Wellington City Council (WCC). Wellington Water Ltd operate the interceptor system that provides bulk wastewater conveyance for Wellington and the majority of its suburbs. The interceptor conveys flows to the Moa Point WWTP for treatment and disposal (1998). The Interceptor has large tunnelled sections (around 16km) and portions of it date from 1898. The Interceptor has been extended and duplicated over its life to form the current layout. The data has been compiled from a variety of sources and its accuracy may vary. Information supplied is to the best of Wellington Water's knowledge, and must not be used for detailed engineering design. Please contact Wellington Water at data.team@wellingtonwater.co.nz if you require more detailed spatial information. Use of this data requires Wellington Water Ltd to be acknowledged as the data custodian. Wellington Water does not warrant or represent that the data is accurate, complete or fit for any particular purpose. Wellington Water does not accept any responsibility for the use of or reliance on the data and shall not be liable to any person on any ground for any loss, damage or expense arising from such use or reliance. Region = Wellington City AND Plan_Reference Like %INTERCEPOR% Data projected in NZGD 2000 New Zealand Transverse Mercator.

本数据集对应惠灵顿市议会(Wellington City Council, WCC)所有的污水拦截系统。惠灵顿水务有限公司(Wellington Water Ltd)负责运营该拦截系统,为惠灵顿市及绝大多数郊区提供规模化污水输送服务。该系统将污水输送至莫阿角污水处理厂(Moa Point WWTP)进行处理与排放(1998年启用)。本拦截系统包含总长约16公里的大型隧道段,部分区段始建于1898年,并在运营历史中历经多次扩建与复线改造,形成当前的布局结构。 本数据集由多种来源汇编而成,数据准确性或存在差异。所提供信息仅基于惠灵顿水务有限公司现有认知范围,不得用于详细工程设计。若需更详细的空间信息,请通过data.team@wellingtonwater.co.nz联系惠灵顿水务有限公司。使用本数据集时,需注明惠灵顿水务有限公司为数据保管方。惠灵顿水务有限公司不对本数据的准确性、完整性或特定用途适用性作出任何保证或声明,亦不对该数据的使用或依赖承担任何责任,不会因任何原因就该使用或依赖所导致的任何损失、损害或费用向任何主体承担赔偿责任。 数据筛选条件为:区域等于惠灵顿市,且计划引用(Plan_Reference)字段匹配包含「INTERCEPOR」的字符串;数据采用NZGD 2000新西兰横轴墨卡托投影坐标系。

创建时间:
2020-06-23
二维码
社区交流群
二维码
科研交流群
商业服务