(Table 3) Calculated consolidation times for sedimentary sections of the Pryd...
收藏B2FIND2026-04-05 收录
官方服务:
资源简介:
For T = 0.05 (and less), only the top of the sediment, immediately beneath the applied load, is consolidated, whereas for T = 1, the sedimentary section is fully consolidated...
当参数T取0.05(及更小值)时,仅施加荷载正下方的沉积物表层发生固结;而当T=1时,整个沉积层实现完全固结。



