Redispatch
收藏资源简介:
Renewable energy generation plants need to be reduced in their feed-in due to grid constraints in order to ensure grid stability. This process is called **redispatch**. The data shall include information on the number of hours and the number of EEG installations that had to be reduced in order to ensure grid stability. *Both the data of current and forecast EEG measures have been compiled with the greatest possible care and prepared for presentation. Nevertheless, in particular recording and transmission errors as well as incomplete delivery by third parties cannot be excluded. Schleswig-Holstein Netz AG therefore expressly reserves the right to change the published data and presentations and assumes no liability for the topicality, completeness and correctness.* Visualisation of the data: https://www.netzampel.energy/shnetz
为保障电网稳定运行,可再生能源发电场站需因电网约束下调上网电量,该过程称为**调度调整(redispatch)**。 本数据集包含为保障电网稳定而需实施电量下调的小时数,以及受影响的《可再生能源法》(Erneuerbare Energien Gesetz,简称EEG)装机数量。 *目前及预测性EEG相关数据均经尽可能严谨的编制与展示准备。然而,仍无法完全排除记录与传输错误、第三方交付不完整等问题。因此,石勒苏益格-荷尔斯泰因电网股份公司(Schleswig-Holstein Netz AG)明确保留修改已发布数据及展示内容的权利,且不对数据的时效性、完整性与准确性承担责任。* 数据可视化页面:https://www.netzampel.energy/shnetz



