five

Repair/Rehab Project J80, Replace Vault Toilets

收藏
DataONE2017-05-10 更新2024-06-26 收录
下载链接:
https://search.dataone.org/view/doi:10.6067:XCV87P91H2_meta$v=1494454079480
下载链接
链接失效反馈
官方服务:
资源简介:
Fieldwork was carried out to inventory four areas that will be disturbed by replacement of pit toilets with vault toilets. Investigators looked for surface evidence of cultural materials that may indicate the presence of significant cultural resources, the need for additional exploration, or a change of project site location prior to disturbance of the area from the installation of new vault toilets. Each vault installation will require excavation of a hole approximately four feet deep by five feet wide by nine feet long. In addition, two cement supports to hold the toilets will extend about eighteen inches deep and five feet from the end of the vault excavation.
创建时间:
2017-05-10
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作