官方服务:
资源简介:
The data in the database is the processing data of the unrelated parallel batch processing machine scheduling problem
应用场景:
创建时间:
2022-03-17
相关数据集
New scheduling algorithms and digital tool for dynamic permutation flowshop with newly arrived order
The permutation flowshop scheduling problem has been widely studied under static environment by assuming machines and jobs are available at the time of zero. However, in reality, new orders arrive at
NIAID Data Ecosystem50
S1 File - Solving multi-scenario hybrid flow shop scheduling problem based on an improved probe machine model
S1 File - Solving multi-scenario hybrid flow shop scheduling problem based on an improved probe machine model
NIAID Data Ecosystem40
Dynamic Dispatching of DDMRP Replenishment Orders
The Demand Driven Material Requirements Planning (DDMRP) is a production control system originally tailored for the VUCA world. Despite research increas-ingly focusing on the dynamic aspects of this p
NIAID Data Ecosystem30
TABLETS_MANUFACTURING: Multi-level, multi-product capacitated lot-sizing problems with linked lot sizes and backorders
This dataset contains anonymized data of five multi-level problem instances of a tablets manufacturing process. The dataset was created in June 2021 based on the research activities of the publisher&#
doi.org40
Data for: A novel discrete water wave optimization algorithm for blocking flow-shop scheduling problem with sequence-dependent setup times
In this material, 480 best known solutions for BFSP/SDST are provided, which include the value and the sequence of the solutions.
Mendeley Data40



