five

Purdue University Buildings Demolition, Construction Images, February 2016, POTR Building Camera 1

收藏
DataCite Commons2025-12-18 更新2025-04-16 收录
下载链接:
https://purr.purdue.edu/publications/2064/1
下载链接
链接失效反馈
官方服务:
资源简介:
<p>[[Video(http://www.youtube.com/watch?v=8WAFq4paZws)]]</p> <p>Purdue's campus landscape continues to change with the construction of new buildings and the remodel of old buildings. In 2012 the Engineering Administration Building (ENAD) and the iconic Heat and Power Plant-North (HPN) were targeted for demolition to make way for the construction of the Wilmeth Active Learning Center (WALC); a building with offices, collaborative spaces and classrooms with an emphasis on new instructional models. The Purdue University Lyles School of Civil Engineering capitalized on a key opportunity for education and research. Five cameras were installed to capture images from the demolition of the Engineering Administration Building and the Power Plant, to the construction of the Wilmeth Active Learning Center. The images from 3 fixed cameras situated on the Mathematical Sciences Building (MATH) and the Potter (A. A.) Engineering Center (POTR) can be accessed and used for educational and research purposes.</p> <p>Representative time lapse videos were created from these three cameras for each month of the project. The time lapse videos created from these images - 08:00 to 18:00, 7 days a week in each month - are accessible here: <a href="http://dx.doi.org/10.4231/R70P0WXD">http://dx.doi.org/10.4231/R70P0WXD</a>.</p>
提供机构:
Purdue University Research Repository
创建时间:
2016-04-11
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作