遇见数据集

H2020 OPERA Project: Mooring System Experimental data from MARMOK-A-5 Wave Energy Converter at BiMEP

收藏
Zenodo2019-07-30 更新2026-04-07 收录
数据链接:
官方服务:

资源简介:

Funded under European Union's Horizon 2020 Programme, OPERA project’s main objective is to reduce the time to market of wave energy, by further advancing in 4 key innovations aiming to reduce up to 50% the Levelized Cost of Energy (LCOE) projections of a floating Oscillating Water Column (OWC) technology. As part of project activities, a condition monitoring system was deployed during the open-sea testing campaign of IDOM's MARMOK-A-5 wave energy converter, while this was deployed in the Biscay Marine Energy Platform (BiMEP) from October 2016 to June 2019. The dataset herein contains a collection of experimental results obtained during this extensive testing campaign, The campaign covers two deployment periods, where the first testing period includes polyesther tethers and the second testing campaing includes innovative elastomeric tethers as described in more detail in the project documentation. This experimental dataset aims to provide quantitative comparison data of the dynamic behavior of the system under these two different configurations.

创建时间:
2019-07-30
二维码
社区交流群
二维码
科研交流群
商业服务