Final Report on the Archaeological Intensive Survey of the Long Island Section of the Spectacle Island-Boston Harbor-Long Island Sewer Line, Boston Harbor Islands, Massachusetts

收藏
DataONE2011-11-16 更新2024-06-27 收录
下载链接:
https://search.dataone.org/view/doi:10.6067:XCV8SB440F_meta$v=1321462203413
下载链接
链接失效反馈
官方服务:
资源简介:
The Central Artery/Third Harbor Tunnel Project proposed to construct a sewer service from Spectacle Island to the City of Boston’s existing sewer system on Long Island for the disposal of leachate and treated sanitary wastewater originating on Spectacle Island. This project called for the construction of a pipeline and pump stations from the south end of Spectacle Island, across Sculpin Ledge Channel to the southwestern end of Long Island. On Long Island, the pipe line will extend northward under Long Island Road to the existing system at the Long Island Rehabilitation Hospital and Recreation Center. Portions of the pipeline corridor maintained low, medium and high potential for the presence of significant Native American and historic period archaeological deposits. Of particular concern was the high potential for human burials in the area of documented cemeteries. Archaeological investigations proceeded in two phases consisting of 10 and 20 interval shovel testing in areas of high and medium potential respectively, followed by machine-assisted scraping and trenching to ensure that no burials would be impacted. Fieldwork resulted in the identification of two possible post holes, a metal culvert, abandoned phone cable and a cobblestone pavement. An earlier ca. 1930s-40s road surface was identified between .5 m and 1 m below the existing road surface. No evidence of human internments was found and the pipeline project was recommended to proceed as planned.
创建时间:
2011-11-16
二维码
社区交流群
二维码
科研交流群
商业服务