five

NRS-12912 | Working plans and sections of railway: Sandy Hollow - Maryvale (Sandy Hollow towards Gulgong),

收藏
Research Data Australia2024-12-14 收录
下载链接:
https://researchdata.edu.au/nrs-12912-working-hollow-gulgong/179117
下载链接
链接失效反馈
官方服务:
资源简介:
These records are undated, however Annual Reports note that construction on this line was begun in 1936 and continued until the work was placed in abeyance in April 1950. Construction apparently followed surveys, section by section, as work progressed.These are the Chief Inspecting Engineer's copies. A full listing is available. (11/1454-75). 22 vols. Note: This description is extracted from Concise Guide to the State Archives of New South Wales, 3rd Edition 2000.
提供机构:
NSW State Archives Collection
二维码
社区交流群
二维码
科研交流群
商业服务