five

Intensive Architectural Survey Report For Palmetto Parkway (I-520) Phase 2 From US 1 To I-20 Aiken County, South Carolina

收藏
DataONE2013-11-12 更新2024-06-27 收录
下载链接:
https://search.dataone.org/view/doi:10.6067:XCV82R3SX4_meta$v=1384271144216
下载链接
链接失效反馈
官方服务:
资源简介:
"Edwards-Pitman Environmental, Inc. conducted an intensive survey of historic architectural resources for the proposed Palmetto Parkway (1-520) Phase 2 from US 1 to Interstate 20 in Aiken County, South Carolina. This report presents the findings of the intensive study. Twenty-seven (27) resources were recorded (Aiken County survey site numbers 2727 to 2753). The majority of the properties surveyed in the project corridor are houses dating between 1920 and 1950, although three stores and two other buildings converted to residences were also recorded. None of these newly recorded properties are considered to be eligible for the National Register of Historic Places."
创建时间:
2013-11-12
二维码
社区交流群
二维码
科研交流群
商业服务