Table 6 - 14 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan
收藏官方服务:
资源简介:
Table 6-14: Reduction in farming area FarmLand Size (before optimisation)Land size (post optimisation)% of original land remainingFarm Hamraqul Baraka (Farm A in the ESSR)158.73 ha73.67 ha46.41%Farm Mehrigiyo (Farm B in the ESSR)325.84 ha7.7 ha2.36%
提供机构:
World Bank (WB)创建时间:
2025-11-27



