Table 6 - 14 in Preliminary Environmental and Social Impact Assessment 100 MW Solar PV Plant by Navoi in Uzbekistan

收藏
Zenodo2025-11-27 更新2026-05-26 收录
官方服务:

资源简介:

Table 6-14: Reduction in farming area FarmLand Size (before optimisation)Land size (post optimisation)% of original land remainingFarm Hamraqul Baraka (Farm A in the ESSR)158.73 ha73.67 ha46.41%Farm Mehrigiyo (Farm B in the ESSR)325.84 ha7.7 ha2.36%

提供机构:
World Bank (WB)