Initial accumulation levels measured on traverse in 1982/83, and re-measurement of some poles on the 1983/84 traverse.These documents have been scanned and are available for download from the provided
Epos-France - GPSMob data from the mission n°07-309 in Pakistan (2007).Responsibles: François Jouanne. Mission started on 2007-12-10 and ended on 2008-01-01. Data were measured on approximately 18 poi