five

Set of optional machine.

收藏
NIAID Data Ecosystem2026-05-01 收录
下载链接:
https://figshare.com/articles/dataset/Set_of_optional_machine_/25077512
下载链接
链接失效反馈
官方服务:
资源简介:
In flexible job shop scheduling problem (FJSP), the collision of bidirectional rail guided vehicles (RGVs) directly affects RGVs scheduling, and it is closely coupled with the allocation of production equipment, which directly affects the production efficiency. In this problem, taking minimizing the maximum completion time of RGVs and minimizing the maximum completion time of products as multi-objectives a dual-resource integrated scheduling model of production equipment and RGVs considering conflict-free routing problem (CFRP) is proposed. To solve the model, a multi-objective improved discrete grey wolf optimizer (MOID-GWO) is designed. Further, the performance of popular multi-objective evolutionary algorithms (MOEAs) such as NSGA-Ⅱ, SPEA2 and MOPSO are selected for comparative test. The results show that, among 42 instances of different scales designed, 37, 34 and 28 instances in MOID-GWO are superior to the comparison algorithms in metrics of generational distance (GD), inverted GD (IGD) and Spread, respectively. Moreover, in metric of Convergence and Diversity (CD), the Pareto frontier (PF) obtained by MOID-GWO is closer to the optimal solution. Finally, taking the production process of a construction machinery equipment component as an example, the validity and feasibility of the model and algorithm are verified.
创建时间:
2024-01-26
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作