PMA Nigeria (Kano, Lagos) Phase 3 Service Delivery Point Survey (2022)
收藏Johns Hopkins Research Data Repository2024-12-20 更新2026-04-18 收录
下载链接:
https://archive.data.jhu.edu/dataset.xhtml?persistentId=doi:10.34976/95EG-8853
下载链接
链接失效反馈官方服务:
资源简介:
PMA Nigeria (Kano & Lagos) Phase 3 Service Delivery Point Survey includes 25 enumeration areas (EAs) in Kano and 52 EAs in Lagos. The EAs were drawn using the same stratified cluster design with urban-rural strata from the National Population Commission’s master sampling frame. The results are representative at the state level. The final sample included 64 facilities in Kano and 126 facilities in Lagos which completed the interview. Data collection was conducted between December 2021 and February 2022. More information about this dataset can be found in the corresponding codebook, accessible at https://doi.org/10.34976/f0vf-qd73
创建时间:
2024-12-20



