Etat des lieux des traversées piétonnes pour les PMR (passages piétons et abaissés de trottoir) en fonction des prescriptions techniques règlementaires liées à l'accessibilité (largeur de passage, pou
Target of 9. Industry, Innovation and Infrastructure Task 9.3: Ensure the availability of road transport infrastructure, which is based on the use of innovative technologies, in particular through the
This project aims to consolidate a database on Tools and Instruments for Assessing the capabilities and limitations of users to be applied in the inclusive design process, obtained through Systematic
In 2017, the authors designed a survey titled Inclusive Design and Dissemination in Digital Scholarly Editions. The survey was designed and hosted using SurveyMonkey (https://www.surveymonkey.com) and