遇见数据集

Data for: An approach based on Bayesian network models for predicting cost overrun risks in engineering projects

收藏
NIAID Data Ecosystem2026-03-11 收录
官方服务:

资源简介:

Data needed to create the CPT of the target node in the Bayesian Network of the case study

创建时间:
2020-04-12
二维码
社区交流群
二维码
科研交流群
商业服务