five

UKCCSRC Call 2 project poster: Dynamic and flexible operation of post-combustion capture: A pilot-scale test campaign with online solvent monitoring, UKCCSRC Manchester Biannual Meeting, 13.04.2016

收藏
data.gov.uk2024-12-22 更新2024-05-31 收录
下载链接:
https://www.data.gov.uk/dataset/085a79d3-d92b-448b-94ce-2f2c0e9c59eb/ukccsrc-call-2-project-poster-dynamic-and-flexible-operation-of-post-combustion-capture-a-pilot-scale-test-campaign-with-online-solvent-monitoring-ukccsrc-manchester-biannual-meeting-13-04-2016
下载链接
链接失效反馈
官方服务:
资源简介:
This poster on the UKCCSRC Call 2 project Towards more flexible power generation with CCS was presented at the UKCCSRC Manchester Biannual Meeting, 13.04.2016. Grant number: UKCCSRC-C2-214.
提供机构:
British Geological Survey (BGS)
二维码
社区交流群
二维码
科研交流群
商业服务