遇见数据集
官方服务:

资源简介:

WOLEEBEE EAST 6M in ATP 692 was drilled from 28/05/2011 to 01/06/2011. A Plug and Abandonment was conducted on 22/06/2020. For P&A details, refer to (Daily Completion & Workover Reports). For Drilling details, refer to (Daily Drilling Reports).

创建时间:
2023-06-22
二维码
社区交流群
二维码
科研交流群
商业服务