The evaluation of multi-step-ahead density forecasts is complicated by the serial correlation of the corresponding probability integral transforms. In the literature, three testing approaches can be f
Engineering model development involves several simplifying assumptions for the purpose of mathematical tractability, which are often not realistic in practice. This leads to discrepancies in the model