DMTN-107: Options for Alert Production in LSST Operations Year 1
收藏DataCite Commons2026-04-23 更新2026-04-25 收录
下载链接:
https://www.osti.gov/servlets/purl/2997867
下载链接
链接失效反馈官方服务:
资源简介:
This document reviews five options for alert production in LSST Operations Year 1 (LOY1), taking into account any implications on LSST formal requirements including up-scopes, down-scopes or explicit violations. The Data Management System Science Team's preferred option for maximizing LSST science is to generate template images from as much of the data from the commissioning and/or science verification phases as possible and use them to run Difference Image Analysis and alert production during LOY1. A proposal to increase the sky area covered during commissioning via a "filler" scheduler program is also presented. As a potential moderate up-scope, this study presents an option to build interim templates on a $\sim$monthly basis during LOY1, which could increase the accessible sky area by ~1000-2000 deg**2 per month, and should be reconsidered closer to the start of Operations.
提供机构:
NSF-DOE Vera C. Rubin Observatory
创建时间:
2025-10-09



