Wilmeth Active Learning Center Building Construction Time-Lapse, August 2014–September 2016
收藏DataCite Commons2025-12-18 更新2025-04-16 收录
下载链接:
https://purr.purdue.edu/publications/2243/1
下载链接
链接失效反馈官方服务:
资源简介:
<p>[[Video(http://www.youtube.com/watch?v=JajjmZ6NfUI)]]</p>
<p>The Thomas S. and Harvey D. Wilmeth Active Learning Center is scheduled to open in the fall of 2017.&nbsp; The 164,000 SF, $79M design-bid-build project has 26 active learning classrooms and a central library that consolidates 6 campus libraries.&nbsp; The facility is located in the heart of campus with an atrium and reading room that overlooks the Bell Tower.&nbsp;</p>
<p>This video was assembled from cameras located on the MATH building for the period of August 2014 to September 2016.</p>
<p>The full data collection can be found at http://dx.doi.org/10.4231/R70P0WXD.</p>