five

Power at Zone (15Min Avg) NOWRA

收藏
data.endeavourenergy.com.au2024-06-12 更新2025-01-09 收录
下载链接:
https://data.endeavourenergy.com.au/explore/dataset/power-at-zone-15min-avg-nowra/
下载链接
链接失效反馈
官方服务:
资源简介:
Historical interval demand data (in megawatts) at Nowra Substation Please note The data in these files is the sole property of Endeavour Energy, and we retain all copyright and intellectual property. We accept no liability for the use of this data by any organisation for any purpose. The data is raw data from Endeavour Energy's System Control and Data Acquisition (SCADA) and metering systems and has not been analysed, assessed or validated for accuracy or quality. No warranty or guarantee is provided as to the data's suitability for any particular purpose as it may: contain occasional metering errors that have led to gaps in the data have spikes and dips in metered load caused by switching of the network include estimates about demand due to different types of metering equipment at respective sites have been withheld for confidentiality reasons in accordance with clause (g) of Rule 5.13A, such as where a substation predominantly supplies large individual customers. If you would like to download demand data for all substations at once please use this dataset. Further enquiries Enquiries or feedback can be sent to Asset-information@endeavourenergy.com.au. Please include your name, organisation and the relevant contact details in your email.

历史时段需求数据(以兆瓦计)于诺拉变电站 请注意 本数据文件仅为Endeavour Energy所有,我们保留所有版权和知识产权。对于任何组织出于任何目的使用此数据,我们不承担任何责任。该数据为Endeavour Energy的系统控制和数据采集(SCADA)以及计量系统中的原始数据,未经分析、评估或验证其准确性或质量。 不提供任何担保或保证,数据是否适合特定用途,因其可能: 包含偶尔的计量错误,导致数据出现空白 由于电网切换而导致的计量负载的峰值和谷值 包括因各站点不同类型的计量设备而对需求进行的估计 根据第5.13A规则第(g)项的规定,出于保密原因而保留,例如变电站主要向大型单个客户供电的情况。 如需一次性下载所有变电站的需求数据,请使用此数据集。 进一步咨询 有关查询或反馈,请发送至Asset-information@endeavourenergy.com.au。请在您的电子邮件中包含您的姓名、组织以及相关联系详情。
提供机构:
data.endeavourenergy.com.au
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作