five

Long Term Development Statement (LTDS) Table 1 Circuit data

收藏
opendatasoft2025-11-28 更新2024-05-31 收录
下载链接:
https://data.opendatasoft.com/explore/dataset/ltds-table-1-circuit-data@ukpowernetworks/table/
下载链接
链接失效反馈
官方服务:
资源简介:
Introduction The Long Term Development Statement (LTDS) report on a 0-5 year period, describing a forecast of load on the network and envisioned network developments. The LTDS is published at the end of May and November each year. This is Table 1 from our current LTDS report (published 28 November 2025), showing the circuit associated with each Grid and Primary substation. More information and full reports are available from the landing page below: Long Term Development Statement and Network Development Plan Landing Page — UK Power Networks (opendatasoft.com) Methodological Approach Site Functional Locations (FLOCs) are used to associate the From Substation to Key characteristics of active Grid and Primary sites — UK Power Networks ID field added to identify row number for reference purposes Quality Control Statement Quality Control Measures include: Verification steps to match features only with confirmed functional locations. Manual review and correction of data inconsistencies Use of additional verification steps to ensure accuracy in the methodology Assurance Statement The Open Data Team and Network Insights Team worked together to ensure data accuracy and consistency. Other Download dataset information: Metadata (JSON) Definitions of key terms related to this dataset can be found in the Open Data Portal Glossary: Open Data Portal GlossaryTo view this data please register and login.
提供机构:
UK Power Networks, Company number 3870728
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作