Long Term Development Statement (LTDS) Table 1 Circuit data
收藏opendatasoft2025-11-28 更新2024-05-31 收录
下载链接:
https://data.opendatasoft.com/explore/dataset/ltds-table-1-circuit-data@ukpowernetworks/table/
下载链接
链接失效反馈官方服务:
资源简介:
Introduction
The Long Term Development Statement (LTDS) report on a 0-5 year period, describing a forecast of load on the network and envisioned network developments. The LTDS is published at the end of May and November each year.
This is Table 1 from our current LTDS report (published 28 November 2025), showing the circuit associated with each Grid and Primary substation. More information and full reports are available from the landing page below:
Long Term Development Statement and Network Development Plan Landing Page — UK Power Networks (opendatasoft.com)
Methodological Approach
Site Functional Locations (FLOCs) are used to associate the From Substation to Key characteristics of active Grid and Primary sites — UK Power Networks
ID field added to identify row number for reference purposes
Quality Control Statement
Quality Control Measures include:
Verification steps to match features only with confirmed functional locations.
Manual review and correction of data inconsistencies
Use of additional verification steps to ensure accuracy in the methodology
Assurance Statement
The Open Data Team and Network Insights Team worked together to ensure data accuracy and consistency.
Other
Download dataset information: Metadata (JSON)
Definitions of key terms related to this dataset can be found in the Open Data Portal Glossary: Open Data Portal GlossaryTo view this data please register and login.
提供机构:
UK Power Networks, Company number 3870728



