five

Monitoring of PCM-Systems for building applications.

收藏
DataCite Commons2020-09-18 更新2025-04-16 收录
下载链接:
http://www.iifiir.org/clientBookline/service/reference.asp?INSTANCE=EXPLOITATION&OUTPUT=PORTAL&DOCID=IFD_REFDOC_0017916&DOCBASE=IFD_REFDOC&SETLANGUAGE=FR
下载链接
链接失效反馈
官方服务:
资源简介:
ZAE Bayern coordinates and supervises two joint projects dealing with the monitoring of PCM-systems in buildings. Both projects focus on the energetic system performance as well as on comfort conditions and help the producers to get feedback about the systems acceptance. The first project showed the need for controlled measurements without user influence to acquire reliable systems data. However, measurements with user influence are essential to learn about the actual systems performance and the operation. That’s why the second project uses a monitoring concept with two phases: Phase 1: Monitoring without user influence (well defined boundary conditions) Phase 2: Monitoring with user influence (real boundary conditions)
提供机构:
International Institute of Refrigeration (IIR)
创建时间:
2016-06-13
5,000+
优质数据集
54 个
任务类型
进入经典数据集
二维码
社区交流群

面向社区/商业的数据集话题

二维码
科研交流群

面向高校/科研机构的开源数据集话题

数据驱动未来

携手共赢发展

商业合作