Stations that meet NEVI requirements (March 2024)
收藏California Energy Commission GIS Open Data2024-03-12 更新2026-04-11 收录
下载链接:
https://cecgis-caenergy.opendata.arcgis.com/maps/1e7df4377f8f449a898f64de93bc2a89
下载链接
链接失效反馈官方服务:
资源简介:
Locations of EV charging stations with DC fast charging capabilities that meet NEVI requirements (as of March 2024). Each NEVI-funded DC fast charging station shall have a minimum of four 150 kW combined Charging System (CCS) connectors and should be located no more than 50 miles apart along freeways and highways and no more than 1 mile from a freeway exit or highway roadway. Data is from the U.S. Department of Energy's Alternative Fuels Data Center Station Data for Alternative Fuel Corridors (as of March 2024) with analysis from the California Energy Commission.
创建时间:
2024-03-12



