遇见数据集

Stations that meet NEVI requirements (March 2024)

收藏
California Energy Commission GIS Open Data2024-03-12 更新2026-04-11 收录
官方服务:

资源简介:

Locations of EV charging stations with DC fast charging capabilities that meet NEVI requirements (as of March 2024). Each NEVI-funded DC fast charging station shall have a minimum of four 150 kW combined Charging System (CCS) connectors and should be located no more than 50 miles apart along freeways and highways and no more than 1 mile from a freeway exit or highway roadway. Data is from the U.S. Department of Energy's Alternative Fuels Data Center Station Data for Alternative Fuel Corridors (as of March 2024) with analysis from the California Energy Commission.

创建时间:
2024-03-12
二维码
社区交流群
二维码
科研交流群
商业服务